Cleanroom construction and design-build

Building a cleanroom runs from requirements through design, construction and start-up. ISO 14644-4 is the international standard that sets out that process for new, refurbished and modified cleanrooms.

Request build-out quotes

Requirements

Start with the target cleanliness class, the occupancy state the room must pass in (as-built, at-rest, or operational), the process inside, and the utilities the room needs.

Design

Design covers layout, airflow, HVAC, and finishes. ISO 14644-4 does not prescribe a particular technology or contract form.

Construction under clean-build protocol

Clean-build protocol is a set of construction practices that keep contamination out while the room is built, such as training crews before site access, cleanroom garments, and cleaning and inspecting tools before they enter.

Start-up and handover

Start-up hands the finished room over against the agreed requirements. Then the room is tested and certified.

Delivery options

OptionWhat it means
Design-buildOne company is responsible for both design and construction under one contract.
Design-bid-buildDesign is completed first, then the build is bid separately.
Modular or prefab supplierA manufacturer supplies a prefabricated room or kit, often with installation.

Construction methods

Rooms are commonly built as conventional (stick-built) construction, modular hardwall systems, or softwall enclosures. See modular cleanrooms, softwall cleanrooms, and the hardwall vs softwall guide.

How to compare quotes

Send every contractor the same scope, then compare inclusions and exclusions — who handles HVAC, electrical, start-up, and documents — before comparing prices. The cost per square foot guide shows why published ranges disagree.

as-built certification quotes

Request build-out quotes

Frequently asked questions

What standard covers cleanroom design and construction?

ISO 14644-4:2022 covers design, construction and start-up of cleanrooms, from requirements to start-up, for new, refurbished and modified installations.

What is design-build for a cleanroom?

One company is responsible for both design and construction under one contract, instead of hiring a designer and then bidding the build separately.

What is clean-build protocol?

Construction practices that keep contamination out while the room is built, such as training crews before site access, cleanroom garments, and cleaning and inspecting tools before they enter.

How do I compare cleanroom construction quotes?

Send every contractor the same scope, then compare what each quote includes and excludes (HVAC, electrical, start-up, documentation) before comparing prices.

Is the room certified after construction?

It should be tested against its target class before use. Certification quotes are on our sister site, Certification Quotes.

Related pages

One request. Multiple quotes. Compare scopes and prices side by side.

Request build-out quotes