Cleanroom upgrades and retrofits

Most upgrades start with a baseline. A current certification or performance assessment shows which system is holding the room back, so you don't replace more than you need.

Start with a baseline

A useful baseline covers particle counts, airflow, pressure, filter integrity, recovery, and temperature and humidity.

Common upgrade scopes

FFU or filter replacement

Check whether the unit or the filter is the problem before you replace either.

Adding filtration or air changes

More filtration or airflow can be enough when the envelope and layout already work.

HVAC capacity, pressure and controls

Some rooms need more supply or return capacity, or tighter pressure control. See HVAC and FFU installation.

Envelope repairs, expansion and reconfiguration

Sealing leaks, adding a bay, or changing the layout can be the main work, with mechanical changes to match.

Knock-on effects

More FFUs add electrical and HVAC load. Pharmacy remodels often need swing space so compounding can continue during the work.

Retest after the upgrade

The changed space should be retested to confirm the upgrade worked. For USP 797 rooms, recertification is required after redesign or construction.

If the goal is a cleaner class, see what it takes to upgrade an ISO 8 room to ISO 7. If you have a recent test report, mention it in your request.

Request upgrade quotes

get a current certification or test report first

Request upgrade quotes

Frequently asked questions

Do I need to rebuild my cleanroom to fix failing results?

Not always. Targeted upgrades can be enough. A baseline test shows which system is limiting the room before you decide.

What should I test before upgrading?

A current certification or performance assessment: particle counts, airflow, pressure, filter integrity, recovery, and temperature and humidity.

Will adding fan filter units affect the rest of my building?

It can. More FFUs need more electrical capacity, and more airflow can change HVAC and return-air needs.

Does an upgrade require recertification?

It should be retested to confirm the change worked. Under USP 797, a room must be recertified after redesign or construction.

Can I keep operating during an upgrade?

It depends on the scope. Pharmacy remodels often need temporary swing space for compounding during construction. Ask contractors to include phasing in their quote.