USP 797 and 800 pharmacy cleanroom build-outs
Sterile compounding rooms under USP <797> (revised chapter official November 1, 2023) use an ISO Class 5 primary engineering control inside ISO Class 7 and 8 rooms. Hazardous drug rooms under USP <800> add a negative-pressure, externally vented containment room.
USP 797 design drivers
Design has to account for those room classes and for placement of the primary engineering control. Certification is required before use and at least every 6 months, and again after redesign, construction, or relocating a primary engineering control.
USP 800 design drivers
The containment primary engineering control sits inside a containment secondary engineering control (C-SEC). The C-SEC is externally vented and must hold negative pressure of 0.01–0.03 inches of water column at all times. USP also sets air-change requirements in its FAQ; a pharmacy cleanroom contractor should apply the current chapter and FAQ to your rooms.
Remodel realities
Converting an existing space into ante and buffer rooms can be hard: space, overhead room for HEPA, low-wall returns, sink plumbing, exhausting a containment hood, and swing space so compounding can continue during construction.
Before you open
Recertify after construction or redesign. State boards of pharmacy also have rules; check yours before design is final. No single state rule is claimed here.
What a pharmacy build-out quote should cover
Drawings, HVAC and exhaust, pressure monitoring, finishes, pass-throughs, phasing or swing space, and who coordinates certification. Related pages: HVAC and FFU installation, hardwall vs softwall, and pharmaceutical cleanroom construction.
USP 797 certification and 6-month recertification
Request pharmacy cleanroom quotes
Frequently asked questions
What ISO classes does a USP 797 cleanroom need?
USP <797> calls for an ISO Class 5 primary engineering control, used inside ISO Class 7 and 8 rooms.
What pressure does a USP 800 hazardous drug room need?
USP says the containment secondary engineering control (C-SEC) must stay between 0.01 and 0.03 inches of water column negative at all times.
Does a USP 800 room need outside exhaust?
Yes. The C-SEC is externally vented.
When is the room certified?
Before first use, at least every 6 months, and again after redesign, construction or relocating a primary engineering control. Certification quotes are on our sister site, Certification Quotes.
Can I keep compounding during a remodel?
Usually you need temporary swing space for sterile compounding during construction. Ask each contractor how they'd phase the work.
Do state boards have their own rules?
Many state boards of pharmacy adopt or add to USP requirements. Check your state board before design is final.
Related pages
One request. Multiple quotes. Compare scopes and prices side by side.
Request pharmacy cleanroom quotes