Modular vs stick-built cleanrooms

A modular cleanroom is assembled on site from prefabricated wall, ceiling and filtration components. A stick-built, or conventional, cleanroom is framed and finished on site by the building trades. ISO 14644-4 covers design, construction and start-up for either method and does not require one or the other. Both still have to meet the same ISO class after start-up.

Facilities anywhere in the U.S. can request quotes here.

Why one request beats ten forms

On a typical contractor's website you fill out a quote form, then repeat that process on the next company's site, and the next. On Get Cleanroom Quotes you describe the build once—size, class, room type and timing—and that request is shared with contractors. You compare the quotes that come back and choose who to hire.

Need quotes? Describe the job once, then compare what comes back. Request quotes with one form →

How the two methods differ

Modular. Wall, ceiling and often filtration components are made off site and assembled in the room. An NIH facilities article (February 2022) describes two basic modular types: panelized systems, and factory-built modular units (from mobile trailers to larger bolted assemblies). Panelized systems use hard, cleanable faces and are typically gasketed or joined into a continuous surface. NIH notes that many wall panels are shallow—often about 2 inches thick—which increases usable floor area but requires early planning of electrical and low-voltage routes, because backbox space is limited.

Stick-built (conventional). The room is framed, finished and fitted on site, trade by trade, inside the host building. This can follow an irregular building shape and can be the path of record when the work is tightly tied to existing structure. Quality of on-site finishing depends on the workmanship and inspection on that job.

ISO 14644-4:2022 specifies the process from requirements through design, construction and start-up for new, refurbished and modified installations. It does not prescribe a technology or a contract form, so neither method is "the ISO method."

This comparison is not the same as hardwall vs softwall. Softwall rooms use flexible curtain walls; both modular and stick-built rooms are usually hardwall when a sealed envelope is required.

Planning, site work and later changes

The same NIH article lists reasons teams look at modular construction, including shorter on-site construction time and the ability to use materials or sizes that are impractical to build in the field. It does not publish a week count. It also lists drawbacks to weigh: limited ability to factory-test some utilities, the possible need to build a shell or open a facade so modules can be placed, and tight installation clearances. It states that cost savings are often touted but may not be realized, and that designers should run a cost-benefit analysis for the specific project.

For a dated modular schedule from one manufacturer, see how long a cleanroom build takes. No comparable published stick-built timeline is used on this site.

Published cost ranges (same kinds of figures, different scopes)

Do not average these numbers. Each row is one publisher, with the scope that publisher stated.

Publisher and dateMethod as publishedRangeScope as stated
Labs USA, Cleanroom Cost & Pricing Guide — 2025Modular hardwall, ISO 7$150–250 per sq ftWalls, ceiling, HEPA filtration, lighting and basic HVAC; specialized HVAC, controls, utilities and furniture are additional
Labs USA, same guideConventional build, ISO 5–7$300–600 per sq ftSame inclusion note as the row above
American Cleanroom Systems, project data 2016–2026Turnkey modular, ISO 7$150–400 per sq ftThat firm's turnkey modular systems

Other publishers give still different ISO 7 figures for ground-up or fit-out hard costs. Those ranges, and why they disagree, are collected on cleanroom cost per square foot. This site has no project data of its own.

How to request quotes for both

If you are choosing a method, say so in the request and ask for modular and conventional options against the same size, class and process. Compare what each quote includes (panels or finishes, HVAC, electrical, installation, start-up, documents) before you compare totals.

Need quotes? Describe the room once and ask for the methods you want priced. Request quotes with one form →

Related pages

FAQ

What is the difference between a modular and a stick-built cleanroom?

A modular room is assembled from prefabricated components. A stick-built, or conventional, room is framed and finished on site. ISO 14644-4 applies to the design-to-start-up process for either method and does not require one or the other.

Is modular always faster or cheaper?

Not as a measured rule. One NIH article notes shorter on-site construction time as a reason teams consider modular construction, and also says touted cost savings may not be realized. Published price ranges disagree by scope. Compare quotes for your room.

Is modular the same as softwall?

No. Softwall rooms use flexible curtain walls. Modular hardwall rooms use rigid prefabricated panels. See hardwall vs softwall.

Can I get quotes for both methods?

Yes. Say that in one request and send the same size, class and process for each option.

Ready to request quotes without filling out a new form for every contractor? Request quotes with one form →

Are you a cleanroom contractor? Join to receive requests →